Simple Installation
Installation of the thermal elements is extremely simple and therefore
quick. Almost no preparation work is necessary.
Here’s how the system
is assembled:
Individual elements are cut at the required angle.
PVC parts and the upper aluminum cover are mounted one within
the other and fixed to the wall by means of screws and plugs. Pipe connections
must be oriented towards the required direction from the start. PVC mountings
are fixed to the PVC profile at 30cm intervals. This way, heat
exchange elements can be fitted on the PVC mountings and connected via
pipe fittings.
Finally the aluminum cover is fixed to the mountings. Materials
are simply bent to fit corners and wall-shapes accordingly. And
that’s all!
« back